Skip to content

U-LAB-06 · University · ML-D · capstone

Integrated Mission, Compare & V&V

Can the team defend an engineering recommendation from a reproducible integrated mission run?

Time
90 min, or two 45-min sessions
Prerequisites
At least two of U-LAB-01 to U-LAB-05 are recommended · V&V vocabulary: requirement, evidence, repeatability, validity
Evidence status
Unit-validated · reduced-order · simulated evidence

Open in MissionLab

These links open existing MissionLab routes. Run the lab there; this page holds the teaching material.

Faculty brief

Teams defend one engineering recommendation from a reproducible integrated run, using Mission Control as the run-inspection instrument and a same-seed comparison.

Prerequisites

  • At least two of U-LAB-01 to U-LAB-05 are recommended
  • V&V vocabulary: requirement, evidence, repeatability, validity

Time and level

90 min, or two 45-min sessions · University · ML-D · capstone

These routes are public software practice. No account or hardware is needed to run them.

Routes to open

Setup

  1. Open University 3U Mission Control in the Engineer view and confirm the canonical run loads; scrubbing replays frames without rerunning physics.
  2. Confirm the header 'Compare' and 'Evidence V2' controls are visible.
  3. Choose one requirement for teams to defend, for example keeping state of charge above a declared floor through eclipse.

Expected student evidence

  • Twin, configuration and model identity from the Advanced view.
  • Integrated telemetry across the ADCS, EPS, payload and OBC, RF, orbit and thermal decks.
  • Replay frames and derived events.
  • A baseline versus variant comparison from the same seed.
  • An exported Evidence V2 file (.json or .md).
  • A V&V conclusion with limitations.

Common misconceptions

  • 'Mission Control is a separate product.' It is the run-inspection instrument inside the Professional Digital Twin.
  • 'Same seed means same spacecraft.' The seed fixes the scenario; the configurations differ.
  • 'An exported file is proof.' Evidence V2 records software evidence and provenance; it is not qualification evidence.

Model limitations

  • Not operational ephemeris, orbit determination or conjunction assessment.
  • Not a hardware-correlated battery model or flight EPS qualification.
  • Not a view-factor spacecraft thermal model or TVAC-correlated result.
  • Not operational RF assurance; atmosphere, modem and BER effects are not modelled.
  • Not a calibrated instrument, radiometry or geolocation model.
  • Not flight GNC certification or measured pointing performance.
  • Every accepted subsystem model is currently unit-validated and reduced-order; no model is calibrated, flight-qualified or correlated with measured hardware.
  • Mission Control inspects one canonical integrated scenario per seed; keeping runs needs configured Mission Studio access and sign-in.
  • Course mappings are illustrative and non-official; no institution has approved or adopted this lab.

Assessment suggestions

  • Use the minimum V&V review as the structure of the written conclusion.
  • Credit evidence another team can reproduce from the recorded seed and hashes.
  • Faculty choose weighting and grading; see the rubric template.

Faculty and their institution own official CLO wording, course approval, grading, rubric adoption and accreditation.