Skip to content

U-LAB-04 · University · ML-D

Payload, Storage & Downlink

How should payload activity be planned when image and data value compete with storage and downlink opportunity?

Time
60–90 min
Prerequisites
Ground sample distance and swath · Data volume, storage and link capacity
Evidence status
Unit-validated · reduced-order · simulated evidence

Open in MissionLab

These links open existing MissionLab routes. Run the lab there; this page holds the teaching material.

Student brief

How should payload activity be planned when image and data value compete with storage and downlink opportunity?

Steps

  1. Open MLX-08 at ML-D and run it. Record mean GSD, usable images, selected data and storage overflow for both cameras.
  2. Open Payload imaging, choose 'Storage and Downlink Bottleneck' and run it. Record selected data, storage overflow and the downlink envelope.
  3. Run 'Target Selection under Limited Capacity' and record which targets were selected and the deltas.
  4. Optionally, open Contact scheduling 'Payload Backlog Across Multiple Contacts' and record delivered data and backlog.
  5. Record the hashes and write your observation plan and limitation statement.
Evidence table. Fill in the value you read and cite where it came from.
EvidenceWhere to find itYour value and citation
Mean GSD, usable images, selected dataMLX-08 run and Payload imaging
Storage overflowPayload imaging
Downlink envelopePayload imaging
Delivered data and backlogContact scheduling (optional)
Artifact hashesEach route's evidence panel

Required plots and metrics

  • Mean GSD and quality score
  • Selected data volume against storage
  • Storage overflow
  • Downlink envelope or delivered data

Engineering decision

Which observations would you plan for the next contact window, and what data would you leave behind?