Skip to content

U-LAB-01 · University · ML-D

Orbit & Ground Contact

When is the spacecraft geometrically available to a station, and what does that evidence not prove?

Time
60–90 min
Prerequisites
Two-body orbits, period and ground track · Elevation, azimuth and range from a ground station
Evidence status
Unit-validated · reduced-order · simulated evidence

Open in MissionLab

These links open existing MissionLab routes. Run the lab there; this page holds the teaching material.

Student brief

When is the spacecraft geometrically available to a station, and what does that evidence not prove?

Steps

  1. Open the Orbit-Pass-Link mission at ML-D and run both declared windows. Record the pass start, end and maximum elevation.
  2. State which rung of the truth ladder the evidence reaches: tracked, signal received or data decoded.
  3. Open the Orbit environment workbench in 'M3-A full teaching environment'. Record eclipse fraction and station elevation, azimuth and range at one cited time, with the artifact hash.
  4. Switch to 'Baseline vs J2 compare'. Record maximum and final |Δr| and |Δv| and explain why the orbits separate.
  5. Open Contact scheduling, choose one declared study and compare the baseline plan with your candidate plan. Record the scorecard and the contact decisions.
  6. Write your scheduling decision and your limitation statement.
Evidence table. Fill in the value you read and cite where it came from.
EvidenceWhere to find itYour value and citation
Pass window: start, end, maximum elevationOrbit-Pass-Link mission run
Truth-ladder rung reachedOrbit-Pass-Link evidence ladder
Station elevation, azimuth and range at a cited timeOrbit workbench, M3-A mode
Maximum and final |Δr| and |Δv|Orbit workbench, Baseline vs J2 compare
Scorecard and contact decisionsContact scheduling
Model version and artifact hashesEach route's evidence panel

Required plots and metrics

  • Pass duration and maximum elevation
  • Eclipse fraction
  • |r| comparison plot and maximum |Δr|
  • Contact scheduling total score and delivered data

Engineering decision

Which contact or contacts would you schedule, and what evidence justifies that choice?