Theory
Frame the trade using performance criteria and bounded policy/language where allowed. Stage intent: schedule.
Flagship experience #2 · review pending
Know when the spacecraft is in view — and know what that still does not prove.
Software-only · M3-A modeled orbit · Reference scheduling
A modeled pass is geometry. It is not proof of signal reception or decoded data.
M3-G scheduling uses a separate declared teaching scenario. It is not derived from the Phase 1 modeled pass.
Tracked ≠ signal received ≠ data decoded. Manifest: implemented_locally_review_pending.
Current academic depth: Grades 11–12 — Analyse · Program · Evaluate · Optimise.
Frame the trade using performance criteria and bounded policy/language where allowed. Stage intent: schedule.
When and where is a selected object observable/contactable in the current Orbit v2 / M3-A teaching environment?
Academic authority: MLX-07 only
Run a phase to load the ladder. L4 reception and L5 decode stay NOT MEASURED.
Check criteria, uncertainty, and forbidden claims.
Unavailable in this software-only experience. There is no SDR, transmit, or remote station control.
Talk about why seeing a spacecraft path on a map is not the same as hearing a radio or reading a message. No live tracking or home radio is required.
Teacher lens: add ?lens=teacher.